Industrial factories
Primary frames for wide production spaces, crane support and roof-envelope systems.
PT KWDPURIFIED COLOR BOARDIndonesia · Steel structure engineering
Turn structural intent into components that can be fabricated and erected
PT KWD supports factories, warehouses and ancillary buildings in Indonesia with steel detailing, fabrication, protective coating, logistics and site-erection coordination. Project quotations follow drawings, location and the agreed delivery scope.

Coordination from shop drawings to erection
Factory fabrication and component numbering
For factories, warehouses and supporting structures
Scope and quotation
Steelwork is quoted by project. A price per kilogram or building area alone does not establish the package cost. Separate component supply from site work so quotations cover the same scope.
Send your steel-structure requirementsDrawings can be shared separately during the WhatsApp discussion. Final design and construction conditions require the responsible engineer's approval. This page is not a structural design document or fixed-price commitment.
Specifications
Steel structures are not a single standard product. Sections, plate thickness, connections, corrosion protection and fire requirements must follow the project design and responsible engineer's approval.
| Parameter | Project range / note |
|---|---|
| Thickness range | Plate and section thickness determined by structural calculation, connections and available material |
| Member width | Detailed as H-sections, box sections, trusses or built-up members |
| Custom length | Segmented for lifting capacity, containers and road-transport restrictions |
| Base material | Carbon or low-alloy structural steel; grade confirmed by design and material certificate |
| Surface treatment | Blast cleaning, primer and topcoat; hot-dip galvanizing or fire coating available where specified |
| Color range | Topcoat color confirmed with the project palette, coating system and maintenance plan |
| Design and execution references | SNI 1729:2020, SNI 1727:2020 and SNI 1726:2019 may apply; cold-formed members may use SNI 7971:2013. Approved design documents govern |
Applications
Primary frames for wide production spaces, crane support and roof-envelope systems.
Regular grids and standardized members improve fabrication and erection efficiency.
Detailed around equipment loads, maintenance access and process clearances.
Light steel solutions for loading zones, walkways and building connections.
Fabrication
Detailing, cutting, assembly, welding and coating are organized around the intended erection sequence to reduce site identification and rework.
Break down members, connections and bills of material around the erection sequence.
Cut, drill and assemble components to the approved dimensions.
Complete qualified weld processes and specified visual or test checks.
Apply surface preparation, coating and clear erection marks.
Protect and load members in the planned site-lifting sequence.

Construction
Steel erection is specialist work. It must follow an approved lifting plan, connection procedure and safety plan; temporary support stays until the stable structural system is complete.
Verify foundation gridlines, levels, anchor bolts and component marks.
Use planned lifting points, temporary bracing and controlled work-exclusion zones.
Form a stable bay before final bolt tightening or site welding to the approved procedure.
Complete alignment, levels, connections, coating touch-up and handover inspection.
FAQ
Quotations may be compared by member weight, building area or package scope, but these bases are not directly interchangeable. Steel grade, span, connections, coating, transport and erection affect the total. Use an agreed material list and itemized quotation.
Yes. Start with the location, intended use, length, width, height, span and any sketch. KWD can help identify missing information. Structural parameters, calculations and construction documents still require the responsible engineer's approval; an initial discussion does not replace approved design.
No scope should be assumed. Confirm foundations and civil works, roof and wall cladding, steel members, coating, transport, lifting equipment and site erection separately, with responsibilities and costs recorded in the quotation.
Timing depends on drawing approval, procurement, member quantities, coating requirements, location and site readiness. A fixed delivery time cannot be promised before those details are checked.
Yes. Sections, connections, coatings, shipping splits and packing can follow approved drawings, with installation briefings where included.
Coverage is defined separately for supply, coating and erection scope in the contract. Maintenance, corrosive exposure and third-party work affect applicability.
Steelwork site photos
Site photographs show roof works, framing and connection details. Design parameters and delivery scope follow each project's approved drawings and contract.



Explore further
Request an engineering quote
Request a quote
Complete the form and choose a service contact. WhatsApp will open with your selected products prefilled. The form is not stored or sent elsewhere.