PT KWD logoPT KWDPURIFIED COLOR BOARD
Back to home

Modular and Prefab Buildings for Project Offices and Staff Accommodation

Deploy offices, accommodation and project facilities faster

PT KWD provides modular and prefab buildings for project offices, staff accommodation and camps. Layout, materials, delivery and installation are discussed around use and site conditions. Contact the KWD teams in Tangerang or Semarang to discuss your project.

Prefab and folding-house project by PT KWD
01

Modular design and rapid deployment

02

Custom dimensions, layouts and envelopes

03

For offices, accommodation and project camps

Modules, structure and envelope configured for the use

A prefab building is a complete system. Final dimensions, loads, fire performance and insulation must be confirmed for the location, use, logistics and local approvals.

ParameterCommon range / note
Envelope thicknessCommon sandwich panels 50–100 mm; selected for insulation and fire requirements
Module widthCommonly approx. 2.4–3.0 m; adjustable for layout and transport
Module lengthCommonly approx. 5.8–6.0 m; combined length developed for the plan
Primary materialStructural steel or cold-formed steel frame with color steel sandwich-panel envelope
Surface finishAnti-corrosion primer and topcoat; hot-dip galvanizing optional for the environment
Color rangeWall, roof and trim colors confirmed against color cards and material MOQ
Design referencesStructural checks may use SNI 1727:2020, SNI 1729:2020, SNI 7971:2013 and local seismic requirements. This is not a certification claim for an unconfirmed project

From temporary facilities to long-term support buildings

Modular Project Offices
01

Modular Project Offices

Plan offices, meeting rooms and reception around user numbers. See the West Java two-storey office project below.

Prefab Staff Accommodation
02

Prefab Staff Accommodation

Confirm occupancy, rooms, bathrooms and shared areas before developing a layout. See the Central Java workforce camp.

Modular Projects in Semarang and Central Java
03

Modular Projects in Semarang and Central Java

The Semarang branch coordinates enquiries about project locations, delivery access and installation needs. Contact DUAN below.

Project enquiries for Semarang and Central Java

Jl. Puri Anjasmoro No. 11C, Tawangsari, Kec. Semarang Barat, Kota Semarang, Jawa Tengah 50144, Indonesia

DUAN · +62 813 9565 253

From module detailing to pre-assembly inspection

Primary structure and envelope components are prepared in the factory to reduce wet work and improve installation control on site.

Brief and layout
01
Brief and layout

Confirm occupants, functions, doors, windows, services and logistics.

Component fabrication
02
Component fabrication

Frames, connectors and panels are produced from coordinated drawings.

Module pre-assembly
03
Module pre-assembly

Dimensions, interfaces, openings and key trim details are checked.

Packing and dispatch
04
Packing and dispatch

Packing follows the intended unloading and lifting sequence.

Foundations, connections and waterproofing shape long-term performance

Foundations, connections and waterproofing shape long-term performance

Site installation must follow structural design, the lifting plan and local safety rules. Building services and fire systems require coordination by the relevant specialists.

  1. 01

    Verify foundation levels, anchors, drainage falls and the lifting area.

  2. 02

    Place numbered modules and complete structural, floor and roof connections.

  3. 03

    Seal panel joints, roofing, openings and penetrations against water ingress.

  4. 04

    Complete electrical, plumbing, fire, grounding and pre-handover checks.

What to confirm before planning a modular building

01What is included in the quotation?

KWD handles electrical and plumbing work inside the prefab units. Materials, structure, panels, openings and utility details are itemised in the quotation; the agreed quotation and contract define the final scope.

02Are foundations, delivery and installation included?

Customers normally provide the foundations; KWD can undertake this work for an additional fee. KWD handles electrical and plumbing work inside the units. Free delivery applies to orders of at least 3 units within 50 km of the factory. Delivery outside these conditions is quoted separately. Installation carries a separate fee; contact the service team for details.

03Can office or accommodation layouts be customised?

Yes. Share occupancy, room functions, bathroom and opening requirements, and site conditions.

04How is delivery to Semarang and Central Java arranged?

Contact the Semarang branch to coordinate the address, vehicle access, unloading and installation. Costs and dates are confirmed for the project.

05What affects the handover schedule?

Drawing approval, materials, module quantity, site readiness, transport and installation affect timing. A delivery plan follows confirmation of requirements.

06Which parts are covered by warranty?

Coverage can differ for structure, panels, openings and utilities. Duration, exclusions and maintenance conditions are defined in the contract.

From project offices to workforce camps

Photos and project information are from our case centre; project sizes are approximate.

Two-storey prefab project offices and management accommodation in West Java

West Java Industrial Park | Project Offices & Management Accommodation

Region
Bekasi area · West Java
Main use
Offices / meeting rooms / management accommodation
Scale
Approx. 30–50 modules

A two-storey modular arrangement improves land utilisation while enabling rapid occupancy and future reconfiguration.

View this project case
Prefab temporary office facilities for a factory expansion in Banten

Banten Factory | Temporary Offices for Expansion

Region
Tangerang area · Banten
Main use
Offices / changing rooms / staff rest areas
Scale
Approx. 20–30 modules

Phased installation kept the existing factory in operation, with provisions for air conditioning, electrical systems and future expansion.

View this project case
Overview of workforce accommodation and living facilities at a Central Java construction camp

Central Java Construction Camp | Workforce Accommodation & Living Area

Region
Semarang area · Central Java
Main use
Dormitories / dining hall / washrooms / management area
Scale
Approx. 1,000–2,000 m²

K-type buildings and modular units combine cost control across a large accommodation area with comfortable, presentable shared spaces.

View this project case
Explore all prefab building projects

Related resources and project records

Request a layout and price

Tell us the use, occupants, room count and project location.