Turn structural intent into components that can be fabricated and erected

PT KWD supports industrial factories, warehouses and ancillary buildings with steel detailing, fabrication, protective coating, logistics and site-erection coordination.

Steel structure fabrication and project work by PT KWD
01

Coordination from shop drawings to erection

02

Factory fabrication and component numbering

03

For factories, warehouses and supporting structures

Structural parameters come from calculations and approved shop drawings

Steel structures are not a single standard product. Sections, plate thickness, connections, corrosion protection and fire requirements must follow the project design and responsible engineer's approval.

ParameterProject range / note
Thickness rangePlate and section thickness determined by structural calculation, connections and available material
Member widthDetailed as H-sections, box sections, trusses or built-up members
Custom lengthSegmented for lifting capacity, containers and road-transport restrictions
Base materialCarbon or low-alloy structural steel; grade confirmed by design and material certificate
Surface treatmentBlast cleaning, primer and topcoat; hot-dip galvanizing or fire coating available where specified
Color rangeTopcoat color confirmed with the project palette, coating system and maintenance plan
Design and execution referencesSNI 1729:2020, SNI 1727:2020 and SNI 1726:2019 may apply; cold-formed members may use SNI 7971:2013. Approved design documents govern

For industrial buildings and production-support structures

Industrial factories
01

Industrial factories

Primary frames for wide production spaces, crane support and roof-envelope systems.

Warehouses and logistics
02

Warehouses and logistics

Regular grids and standardized members improve fabrication and erection efficiency.

Equipment platforms and mezzanines
03

Equipment platforms and mezzanines

Detailed around equipment loads, maintenance access and process clearances.

Canopies and links
04

Canopies and links

Light steel solutions for loading zones, walkways and building connections.

Numbering, welding and dimensional control connect factory and site

Detailing, cutting, assembly, welding and coating are organized around the intended erection sequence to reduce site identification and rework.

Detailing and planning
01
Detailing and planning

Break down members, connections and bills of material around the erection sequence.

Cutting and assembly
02
Cutting and assembly

Cut, drill and assemble components to the approved dimensions.

Welding and inspection
03
Welding and inspection

Complete qualified weld processes and specified visual or test checks.

Coating and marking
04
Coating and marking

Apply surface preparation, coating and clear erection marks.

Packing and dispatch
05
Packing and dispatch

Protect and load members in the planned site-lifting sequence.

Lifting stability, temporary bracing and final tightening are essential

Lifting stability, temporary bracing and final tightening are essential

Steel erection is specialist work. It must follow an approved lifting plan, connection procedure and safety plan; temporary support stays until the stable structural system is complete.

  1. 01

    Verify foundation gridlines, levels, anchor bolts and component marks.

  2. 02

    Use planned lifting points, temporary bracing and controlled work-exclusion zones.

  3. 03

    Form a stable bay before final bolt tightening or site welding to the approved procedure.

  4. 04

    Complete alignment, levels, connections, coating touch-up and handover inspection.

What to prepare for a steel-structure enquiry

01What is the minimum order quantity?

Steel structures are normally project-priced without a single MOQ. Drawings, span, area and location help establish a practical fabrication batch.

02How long does overseas delivery take?

The schedule depends on drawing approval, material procurement, tonnage, coating, packing method and destination-port sailings.

03Can the structure be customized?

Yes. Sections, connections, coatings, shipping splits and packing can follow approved drawings, with installation briefings where included.

04What is the warranty period?

Coverage is defined separately for supply, coating and erection scope in the contract. Maintenance, corrosive exposure and third-party work affect applicability.

Case-study structure ready for project information

01

Industrial factory frame

Project photographs, structural scale and description to be added

02

Warehouse and logistics structure

Project photographs, structural scale and description to be added

03

Equipment platform and link bridge

Project photographs, structural scale and description to be added

Request an engineering quote

Send drawings, span, area, loads and location so we can structure the enquiry.